Custom Apparel
Custom cut & sew product includes custom silhouettes and fabrications. Please refer to the Product Catalog for an image library of existing bodies and fabric swatches.
Note: cut & sew bodies can be produced domestically with lower MOQ and shorter leadtime, though at a higher cost. Available fabrications will be subject to stock fabric availability, and silhouettes will be limited to simplified bodies.
Overseas cut & sew allows for lower cost, along with wider fabrication and customization options. Leadtimes will vary based on quantity and complexity, but MOQ will need to be quoted.
Cut & Sew Tier One—inclusive of simple bodies that have already been developed domestically with limited customization. Please refer to the appendix for estimated cost, MOQ, leadtimes and available fabric options.
Product Options:
-
T-Shirts, Tanks, Long Sleeves
-
Fleece—pullover and zip hoodies, crewnecks, joggers etc.
-
Satin Bomber Jackets
-
Cotton Twill Work Jackets
-
Poplin Boxer Shorts
-
Swimwear
-
Jerseys
-
Underwear
-
Sleepwear
Cut & Sew Tier One General Leadtime
Full Inventory Domestic Custom including sampling and physical samples for approval:
|
|
Duration |
|
Brand Manager Line Plan Finalized |
|
|
Sourcing Inquiry w/ PD |
1 week |
|
Creative Development |
2 weeks |
|
Artist Design Approval and Design Revisions |
2 weeks |
|
Input into Aprimo |
7 days |
|
Sample Creation |
3 weeks |
|
Artist Sample Approval |
1 week |
|
Buy Approval Process |
3 days |
|
Production Process |
6 weeks |
|
Receiving Process |
5 days |
|
Inventory in WHS |
1 day |
|
Total Time Needed |
16 weeks start to finish |
Cut & Sew Tier Two—inclusive of more complex styles that have been developed overseas with wider fabrication and customization options. Please refer to the appendix for estimated cost, MOQ, leadtimes and available fabric options but note, new styles will need to be requoted based on design and quantity. Fit can be adjusted based on already developed specs.
Product Options:
-
Satin robes and sleepwear
-
Elevated Outerwear—varsity jackets, heavy work jackets, leather jackets, denim
-
Elevated Jerseys
-
Athletic Shorts
-
Rugbys & Polos
-
Sweaters & Knitwear
Cut & Sew Tier Three—Brand new development. Reference samples/images to be provided to PD team. Fabric + trims to be sourced as needed and will require technical design team to create tech packs and fit sample rounds accordingly.
Fabrication Options:
-
100% Cotton (Carded or Combed Ring-Spun)
-
Organic Cotton
-
Recycled Cotton
-
Organic Cotton/Recycled Cotton Blends
-
Recycled Polyester
-
Conventional Polyester materials: mesh, satin, etc.
-
French Terry & Fleece (Brushed or Loopback): 100% Cotton and Cotton/Poly Cotton Blends
-
Ribbed, Slub, or Textured Fabrics
-
Faux Leather/Genuine Leather
-
Wool
Customization Options—to be quoted based on design:
-
Garment Washes (Vintage, Enzyme, Pigment): +$2.00–$4.00/unit
-
Custom Dye (Pantone Match): +$1.50–$3.00/unit
-
Embroidery & Patches: See above
-
All-Over Sublimation: +$6.00–$10.00/unit
-
Panel Customization / Unique Seams: +$2.00–$5.00/unit
-
Private Labeling / Woven Tags: +$1.50–$2.50/unit
-
Custom Trims (Drawcords, Zippers, Hardware): +$0.50–$2.50/item
Cut & Sew Tier Two and Three General Leadtime
Full Inventory Overseas Custom including 1 round of sampling and physical samples for approval (via air)
|
|
Duration |
|
Brand Manager Line Plan Finalized |
|
|
Sourcing Inquiry w/ PD |
1 week |
|
Creative Development |
2 weeks |
|
Artist Design Approval and Design Revisions |
2 weeks |
|
Input into Aprimo/Spec Creation |
7 days |
|
Sample Creation (1 Round) |
3 weeks |
|
Artist Sample Approval |
1 week |
|
Buy Approval Process |
3 days |
|
Production Process |
12 weeks |
|
Transit Timeline - AIR |
2 weeks |
|
Receiving Process |
5 days |
|
Inventory in WHS |
1 day |
|
Total Time Needed |
25 weeks/6 months start to finish |
For a more tailored workback schedule, please use our Timeline Calculator or reach out to your PD team lead.